Bluegreen has delivered an advanced piping system to Heidelberg's carbon capture facility in Brevik, including a 750-meter-long seawater pipeline extending to a depth of 90 meters, PE pipes underground, and double-walled PP pipes above ground. The "Langskip" project is a key part of Norway's initiative for sustainable carbon capture and storage.
Bluegreen has delivered prefabricated PE-pipe components such as spools and bends, installed PE-pipes and fittings in the hazardous waste facility at Langøya, and taken responsibility for all non-metallic piping. The project combines precise prefabrication and advanced solutions to support sustainable hazardous waste management.
Bluegreen has delivered extensive pipework for the new energy central for Drammen Fjernvarme. The project included intake and discharge pipelines in PE, installation of PE pipes, and mechanical work in the seawater intake chamber and energy central at a depth of 17 meters. The project ensures sustainable heating and cooling production based on seawater.
Bluegreen has delivered marine plumbing work for the Energy Central Clemenskvartalet, including the installation of double seawater pipelines, intake and discharge pipes, as well as pipes and fittings in the energy central.