Bluegreen delivered two 55 m³ PE tanks, custom-built to specifications, to NEL's hydrogen plant at Herøya. The tanks were transported by both sea and land, with careful planning to ensure efficient transport and installation.
Bluegreen designed and produced custom-made carbon filters in gray PE for Lindum Clairs. The project included tailored design and prefab using a CNC milling machine to ensure optimal fit based on the client’s requirements.
Bluegreen delivered a custom-designed PE water manhole for Porsgrunn Municipality's project to upgrade the water and wastewater infrastructure. The water manhole is 100% sealed, designed according to the client's specifications and local ground conditions, and has a lifespan of 100 years.